Listing no longer available - expired.
Other Vehicles, Plant & Construction Listed: 2018-06-23 19:53

Koparka gąsienica 22 tony

(No. 2877096)
Koparka gąsienica 22 tony

Item length [m]:

8

Item width [m]:

3

Item height [m]:

2.70

Total weight [kg]:

22500.00

What is your budget? [PLN]:

800

Distance: 188.00 km

Plant & Construction

In Plant and Construction subcategory we placed all the heavy-duty machines, usually used in construction jobs. They serve different purposes but what they have in common is huge size and weight.

Plant and construction subcategory contains variety of machines, ike:

- track-type machines, including bulldozers and snowcats

- excavators, including bucket-wheel excavators, power shovels, yarders as well as reclaimers

- forestry vehicles – e.g. wheel forwarders or skidders

- loaders – e. g. wheel loader

- material handlers – which consist of lift tables, straddle carriers as well as reach stackers

- machines used in paving – which include: asphalt paver, pavement milling, roller compactor and slip form paver

- machines used for tasks performed underground, like: road headers or underground mining equipment

- equipment used for road construction and maintenance, for example street sweepers

Cost of heavy equipment transportation

Cost of heavy machines shipment is strongly related to its weight and size. Technical condition is factor, as it often affects how the machines can be transported. The price will be further influenced by the distance between loading place and unloading place and whether or not you will need to choose the delivery date. For transporting heavy machines on international routes you will have to pay more than for shipping within the country.


Pick-up address and date

Wyszogród, 09-450, Poland

Flexible dates

Delivery address and date

Skarżysko Kościelne, 26-115, Poland

Flexible dates